Go Back

I-35 Pine City Interchange

TDA was installed in an area of poorly graded, low strength soils. The site needed to be reinforced for future commercial development, so Tire Derived Aggregate was used to negate the weak native soils and low elevation, providing a proper foundation and site pad.